
Project Location
Hillsboro,
OR
Client
Washington County
Market Sector
Project Type
- Transportation
Services Provided
Project Highlights
- Design of multi-modal features, including sidewalks, bike lanes, and pedestrian safety enhancements such as rectangular rapid flashing beacons.
- Reconstructed roadway with two through lanes and new turn lanes at SW 205th Avenue and SW Stoddard Drive.
- Included upgraded infrastructure: streetlights, planting strips, and stormwater mitigation systems.
Project Description
The SW Kinnaman Road Improvement project targets a 1,700-foot stretch between SW 198th and SW 209th Avenues. This project enhances neighborhood mobility by introducing key improvements such as new sidewalks and bicycle lanes, aiming to boost safety, accessibility, and connectivity for the surrounding community, including school routes to Butternut Creek Elementary and access to the South Hillsboro development.
Led by MacKay Sposito, the project includes roadway reconstruction, the addition of turn lanes, and the installation of multi-modal features and environmental systems.